House repairs part 1

It has been a very wet month. Almost messed up our plans for everything.
First of all, we had the foundation fixed on our house. It wasn't in bad shape, probably a 2 on a scale of 10, but we wanted it fixed up before we did other long term goals on the house. Only this required the rain to cooperate. Yes it did rain a bit on the 2nd day they were working on it, but only a bit. It also started raining some as they were finishing up on it and laying new concrete. The day after they were done, the rains came, and hard. Whew, done just in time. Some of the new concrete slabs look funky, but it all worked out.
Then we had someone come by and fix some woodwork to get ready for upstairs tile work. We asked him to come back and install some new doors we've been thinking about getting, which the tile people strongly recommend we get BEFORE the tile goes in. He was scheduled on Monday and it poured even worse than the previous rain storm. So he had to postpone until Tuesday. We had a front door put in and replaced the sliding glass door with french doors. Also we had him fix the cracks along the outside of the house and redo some window sills. Yeah, Jeff could have done the sills, but since he was there, we had him do those too. Doors look great and they shut real well too.
Kymie has been keeping our dogs for us, so we are much appreciated with her on that. Thanks to Jim for carting the french doors home since it wouldn't fit in or on the SUV and I didn't have a current insurance card to rent a truck. Kym's payment is lunch or dinner. Jim's payment is leaving the WII at his place so he can play and practice. The football game would be exceptional if it weren't for the bugs in it. Maybe next edition will be better.
All that's left is finish painting and tile work. Are we there yet???