These photos are of the re-roofing of my dad's old Building. It was completed on September 16 and started on the 12th. It took so long to do because scattered thunder storms kept us from safely working on that roof all that weekend. Also it took me from the 27th of August until September 16 to round up all the materials to fix the building(Sheet metal roof panels, epoxy liner, sheet metal screws, gloves and other tools we needed to do the job). The roof is a Mueller prefabricated roof that we had to cut down a foot to use on the building. Chewy Gonzales did all the fastening of the sheets and most of the other work. I helped him drag the sheets up on the roof, held the sheets while he cut them, scrounged good sheets from the old roof to connect the old roof to the new roof, and removed debris from the job site.
Comments
ReBuilding Photos
These photos are of the re-roofing of my dad's old Building. It was completed on September 16 and started on the 12th. It took so long to do because scattered thunder storms kept us from safely working on that roof all that weekend. Also it took me from the 27th of August until September 16 to round up all the materials to fix the building(Sheet metal roof panels, epoxy liner, sheet metal screws, gloves and other tools we needed to do the job). The roof is a Mueller prefabricated roof that we had to cut down a foot to use on the building. Chewy Gonzales did all the fastening of the sheets and most of the other work. I helped him drag the sheets up on the roof, held the sheets while he cut them, scrounged good sheets from the old roof to connect the old roof to the new roof, and removed debris from the job site.